2026 Victorian rates

Melbourne Home Builds

Splits the price into the house and the block it sits on: site costs, soil, slope, permits and fees.

11 questions · Free · No sign-up · GST included

Screenshot of the Melbourne Home Builds
Questions
11 questions
Rates
2026 Victorian rates
Price
Free
Sign-up
None
The Melbourne Home Builds on screen

What will it actually cost to build your home?

Melbourne Home Builds splits the price into the two halves nobody separates for you: the house, and the block it has to sit on.

Site costs, soil, slope, permits, 7-star compliance and the statutory fees are all in the number, with GST already included.

The Melbourne Home Builds open in a browser

The house itself

Size, storeys and the builder you choose set the base. Every answer moves the rate per square metre, and you can see it change as you go.

Because the house is priced on its own, you can compare it directly against a builder’s contract price.

Close-up of the estimate and first question in the Melbourne Home Builds

The block it sits on

Two identical homes can cost very different amounts on two different blocks. Fall across the site, soil type, access and external works all land in the site half of the estimate.

Seeing that figure early helps you judge a block before you buy it, not after.

Close-up of the Melbourne Home Builds headline

Permits, warranty and the fees in between

Permits, surveyor, engineering and soil reports, the building permit levy and home warranty are listed line by line.

Nothing is hidden in a lump sum, so the per-square-metre figure at the end is a genuine all-in number.

How it works

  1. 01

    Answer the questions

    It starts with “How big is the house?” Each answer is a slider or a simple choice.

  2. 02

    Watch the range move

    The estimate updates as you go, with the low end and the high end both shown.

  3. 03

    Take it to your quotes

    Compare what you are quoted against a range you understand, line by line.

Questions people ask

Is the Melbourne Home Builds free?

Yes. It is free to use, there is no sign-up and nothing asks for your email.

Why split the house and the block?

Because builders quote the house, while the site costs often arrive later as variations. Seeing both halves up front shows the real total.

Is GST included?

Yes. Every figure includes GST.

How many questions does it ask?

11 questions. It starts with “How big is the house?” and the estimate updates as you answer.

Is the estimate a quote?

No. It is an indicative range based on current rates for Melbourne. Prices vary by site, supplier and job, so get a written quote before you commit.

Ready when you are.

11 questions, a real range at the end. Nothing to sign up for.

Open calculator